Syria rig spare parts

Syria rig spare parts

BOMCO ZJ40D, ZG40D Rig spare parts

The list of the required parts for ZJ40D Rig

Item Description Inspected ProblemsRemarksModel \ Part NumberQuantity

 

Mechanical Parts
1Crown Block
1.1Main sheave bearing 37941K(¢203.2*276.225*95.251 pcs
2Traveling block
2.1Main sheave bearing 37941K(¢203.2*276.225*95.251 pcs
3Swivel
3.1Swivel SL-2251 pcs
4Mast and Substructure
 

4.1

Climb assistor  

JJ44405-CZ18

 

1 Set

 

4.2

Escape device of monkey board  

型号待确定 TBD

 

1 set

 

 

4.3

 

Big U clamp for mast and A beam

  

 

型号待确定 TBD

 

 

4 pcs

 

 

4.4

crown-o-matic that fix on A beam.  

 

型号待确定 TBD

 

 

1 set

 

4.5

 

monkey board air winch

  

0.5吨风动绞车 0.5T air winch

 

1 pcs

4.6Wireline for raising mast and substrcutre 图号Drawing No.JJ4444.06-130100。出厂编号Serial No.2011-J279-

11.OD=72mm.L=50.7m。负载Load capacity=1585KN

 

2 pcs

5Drawwark
5.1 

 

Quick-release valve

 

 

KPM-L156 Pcs
 

 

 

 

5.2

 

 

 

Air faucet are damaged

 

 

 

 

 

 

XJ-L15

 

 

 

 

4pcs

 

 

 

 

5.3

 

 

Pneumatic clutch main body-Quick release valve

 

 

  

 

 

 

KPJ-L

 

 

 

 

6 pcs

 

 

5.4

 

 

 

Drawworks- Toggle valve

  

 

 

FP-L6A

 

 

 

1pcs

 

 

5.5

 

绞车电磁涡流刹车气管线Magnetic eddy current brake-Center pipe gas line

 

 

 

 

13II-7000C

 

 

2 pcs

 

 

5.6

 

water cooling hose of drawworks

  

 

2 pcs 25I-15000C and 2 pcs 25I-10000C

 

 

each 2 pcs

 

 

5.7

 

Drawworks-Air control box

  

 

NPT 1/4

 

 

40 pcs

 

5.8

the air control hose from driller cabin to drawworks  

8I-15000NPT 1/4 match quick connector

NPT1/4气快插母接头

 

40 pcs

 

 

5.9

Main air pipelines from the pneumatic house to the ground cable tray  

 

51II-20000C 12mpa

 

 

1 pcs

 

 

5.10

 

Connection pipelines between the ground cable tray.

  

 

51II-2000C 12mpa

 

 

2 pcs

 

 

 

5.11

 

 

Air pipes from the ground cable tray to the intermediate cable tray

  

 

 

51II-3500C 12mpa

 

 

 

2 pcs

 

 

 

 

5.12

 

 

Main air pipelines from the intermediate cable tray to the elevated cable tray

  

 

 

 

51II-5000C 12mpa

 

 

 

 

2 pcs

 

 

5.13

Main air pipelines from the elevated cable tray to the reserve tank on drill floor  

 

51II-5000C 12mpa

 

 

1 pcs

 

5.14

Main tubes of left and right air winch  

51II-3500C 12mpa

 

2 pcs

 

 

 

 

5.15

 

 

 

Gas cylinder safety valve on drill floor

 

 

 

 

 

 

 

型号待定 TBD

 

 

 

 

1 PCS

 

5.16

Main air tube from the gas cylinder to the right side of the substructure  

 

51II-6000C 12mpa

 

 

1pcs

 

 

5.17

Main air tube from

the gas cylinder to the left side of the

substructure

  

 

51II-6000C 12mpa

 

 

1 pcs

 

5.18

Gas cylinder-air pressure gauge  

型号待定 TBD

 

1 pcs

 

 

5.19

Main air tube from the gas cylinder to drawworks  

 

25II-7000C

 

 

1 pcs

6Hydraulic power unit
 

 

 

6.1

 

 

 

HPU- machine pump

 

 

 

 

 

CY14-1B

 

 

 

1pcs

 

 

 

 

6.2

 

 

 

HPU- Disc brake pump

 

 

 

 

 

 

型号待定TBD

 

 

 

 

1pcs

 

6.3

Machine and tool HPU- Water cooling pipe  

38I-20000C

 

2pcs

 

6.4

Drawworks- flexible wireline  

32mm 右旋 right wiring

 

1 set

7mud pump
7.1drilling rotary hose  4inch*35mpa*23meter1 PCS
 

 

 

 

7.2

 

 

discharge high pressure hose of mud pump

  

 

 

 

4*35mpa.4,1003              5m and 4.35m

 

 

 

 

5m /4.35m

7.3 

 

 

Pulsation chamber

 . 

 

 

F-1300

 

 

 

2 pcs

 

 

 

 

7.4

 

 

 

 

linner pump

 

 

 

 

 

 

F-1300

 

 

 

 

1 pcs

7.5 

 

 

drive belt of mud pump

  

 

 

4ZV25J*7620

 

 

 

4 pcs

7.6drive belt of mud pump  

5ZV25J*7620

 

2 pcs

8BOP Stack
 

 

8.1

 

 

Annular BOP

 

 

 

 

 

 

 

FH35-35 Rong Sheng BOP

 

 

1 set

 

8.2

 

Annular BOP rubber core

   

FH35-35

 

1 pcs

 

 

8.3

 

Annular BOP repair kit

   

 

FH35-35

 

 

1 set

 

 

8.4

 

Single-ram BOP repair kit

  

 

FZ35-35

 

 

1 set

 

8.5

 

Drilling spool

   

FS35-35

 

1 set

 

8.6

Double-ram BOP repair kit  

FZ35-35

 

1set

 

8.7

Connecting bolt of BOP 

 

35-35 环形四通 ,相互直接连接螺栓 一 套 。 Connecting bolts for drilling spools of annular-double-single ram BOPs, 1 set

 

 

1 set

9Others
 

 

 

9.1

 

 

 

Water tank-4″ water pipeline

 

 

 

 

 

 

 

 

 

ID127-2P-3mpa L=15m

 

 

 

1 pcs

 

 

9.2

 

 

fire pump

 

 

 

  

 

型号待确定 TBD

 

 

1 set

 

 

9.3

Weight indicator and standpipe pressure sensor rubber tube 

 

 

 

 

 

8I-25000NPT1/4

 

 

4 pcs

 

 

9.4

Cold start air compressor  

 

 

 

 

w-0.8/12

 

 

1 pcs

 

 

9.5

 

Main fuel tank and elevated fuel tank

 

 

  

 

50m³+3m³

 

 

1 set

 

 

 

9.6

 

standpipe pressure sensor

 

 

 

 

 

 

21502式由壬,胶杯式 2 inch and connect way is union with rubber inside

 

 

 

 

2 pcs

 

 

9.7

the pipe stack from BOP remote control to BOP body  

 

 

厂家 :广州东朔石油设备机械厂,远控房型号:YCQ1280-7,厂家制作。

 

 

1 pcs

 

 

 

9.8

 

 

 

 

air hose from rig floor to mast

 

 

 

 

 

 

 

51I-6000C

 

 

 

 

 

2 pcs

 

 

 

 

 

9.9

 

 

 

 

air hose from rig floor to mast

 

 

 

 

 

 

 

 

 

 

 

13I-6000C

 

 

 

 

 

3 PCS

 

 

9.10

the hose form BOP body to chock manifold and kill manifold   

 

型号待确认 TBD

 

 

each 1 pcs

 

9.11

 

kinds of air connector

 

 

 直通接头adptor: M13*1.5/NPT1/4 M22*1.5/NPT1/2 M30*1.5/NPT3/4 M39*1.5/NPT1 M51*2/NPT2 

each 10 pcs

 

9.12

 

kinds of air connector

 

 

 内 接 :NPT1/4 NPT1/2 NPT3/4 NPT1 NPT1-1/2 NPT2 外接:NPT1 NPT1-1/2

NPT2 弯头NPT1 NPT1-1/2 NPT2

 

each 10 pcs

 

9.13

 

ball valve

 

 

 NPT1/4 NPT1/2 NPT3/4 NPT1 NPT1-1/2 NPT2 

each 5pcs

 

9.14

hydraulic quick connector  

 

 

H2.62/63 H3.62/63 H4.62/63 H6.62/63

 

each 5pcs

 

9.15

hydraulic quick connector   

H8.62/63          H10.62/63

 

each 2 pcs

 

9.16

Mast moving device  

 

 

型号待确认 TBD

 

1 set

Electrical Parts
1TDS Top Drive System
 

 

 

 

 

1.1

 

 

 

 

Air condition of TDS VFD house

 

 

 

 

 

 

the control cable and power cable were damaged

 

 

 

 

 

American standard cable美标线缆4C 6,

 

 

 

 

 

18m

 

 

 

 

1.2

 

 

 

 

Transformer of TDS

 

 

 

 

The cable of transformer damaged

 

 

 

 

3C14, 4C14

 

 

 

 

18m

 

 

 

 

 

1.3

 

 

 

 

Outlet panel of top VFD house

 

 

 

 

Alarm lighting is damaged

 1  Set
2RIG FLOOR
 

 

 

 

2.1

 

 

 

DW B motor

 

 

 

The connection box is deformed  
 

 

 

 

2.2

 

 

 

DW A blower

 

 

 

 

 

 

 

missing ventilation

过滤YGFZ-02,YF23B,YB2160M2-2W, Filter blower YGFZ-02, blower YF23B, motor of blower YB2160M2-2W. 
 

 

 

 

2.3

 

 

 

DW B blower

 

 

 

 

 

 

 

 

风机过滤器YGFZ-02,风机YF23B,风机电机YB2160M2-2W, Filter blower YGFZ-02, blower YF23B, motor of blower YB2160M2-2W.

 
 

2.4

 

RT blower

 

 

 风机过滤器YGFZ-02,风机YF23B,风机电机YB2160M2-2W, Filter blower YGFZ-02,

blower YF23B, motor of blower

 
 

2.5

 

Driller’s cabins

 No Plug onjunction boxا三相五极25A

三相四极25A

ا单相三极25A

 
 

 

 

 

 

 

 

 

 

 

 

 

 

2.6

 

 

 

 

 

 

 

 

 

 

 

Right dog house of rig floor

 

 

 

 

Missing lighting cable to right side of mast

 

 

3×2.5

 

 

 

 

30m

 

 

Lighting embedded cables were damaged

 

3×2.5

 

 

 

 

28m

 

 

 

 

Missing lighting cable to mast

 

3×2.5

 

80m

Camera power is damagedSFD型防爆箱输入type Ex Junction box input 85-265VAC         输 出 output 24- 27VDC 

 

一台 one set

 

 

 

 

 

 

 

2.7

 

 

 

 

 

 

Driller’s cabin output panel

 

 

 

 

 

 

 

DW encode control

 

 

 

12心线缆 12 core cable

 

 

 

1 set

   DW disc brake

control line and plug

单相3极25A,Single phase three pole 25A 

3×1

 

18m

   Anti-

collision of travelling block signal line and

3 相 4 极 25A,Single phase three pole 25A

 

4×1

 

21m

 

 

 

2.8

 

 

 

Drawwork

 

 

 

 

The cable of the blower is damaged 

 

 

3*4+1*2.5

 

 

 

7m*2

2.9rotary table The

cable of the blower is damaged

3*4+1*2.512m
2.10driller’s cabin  

The cable of the oil pump motor is damaged

 

 

3*4+1*2.5

 

 

12m

 

 

 

2.11

 

 

Right doghouse of rig floor

 Microphon 1pc
   

 

 

 

Explosion-proof fluorescent lamp is missing

 

 

BAY51-2×40

 

 

两盏two

3Solid control system 
 

 

 

3.1

 

 

 

No.2 mud tank

 

 

 

 

 

Desander pump cable is damaged

 

 

 

3×35+1×25

 

 

 

24m

 

 

 

3.2

 

 

 

mud pump house

 

 

 

control panel of the supercharge pump is missing

 

 

 

LA53-2T

 

 

 

2sets

 

 

 

3.3

Spray and motor of mud pump    
 

 

 

    NO.3 mud tank

 

 

 

 

 

 

no Plug in junction box

三相四极150A

单相三极25A

ا三相四极15A

三相四极100A

三相四极150A

三相四极200A

三相四极

 

 

 

each 4 pcs

No.4 mud

tank

  

no Plug in junction box

单相三极15A

单相三极25A

4 PCS and 1 pc
 

 

No.2 mud tank

 

 

 

 

 

no Plug in junction box

三相四极200A

三相四极150A

三相四极60A

三相四极25A

三相四极150A

单相三极25A

 

 

each 2 pcs

  

No.1 mud tank

 no Plug in junction box三相四极60A

三相四极25A

单相三极25A

 

each 2 pcs

 

Cooling tank

 

 

 

no Plug in junction box

三相四极200A

三相四极15A

أ单相三极25A

 

each 2 pcs

 

 

NO.3 mud tank junction box

 

 

 

 

Lighting cable is demaged

Cable

 

 

3×2.5

 

 

10m

 

 

 

 

 

 

 

 

 

 

 

 

 

3.4

 

 

 

 

 

 

 

 

 

 

 

No.4 mud tank junction box

  

 

 

 

 

 

 

 

 

 

 

Shear pump power cable missing 

3×35+1×25

 

17m

   Circulate tank power cable missing 

3×35+1×25

 

17m

   Trip tank control cable1and 2 is 

4×1各一根 each one

 

17m

   Mud pump control cable

missing

 

4×1

 

17m

    Sand pump control cable missing 

4×1

 

17m

   Spare power cable missing 

3×6+1×4

 

17m

   Logging powercable missing 

3×6+1×4

 

17m

   Sand pump power cable missing 

3×35+1×25

 

17m

 No.4 tank back side  Lighting cable missing 

 

3×2.5

 

 

16m

  

 

No.4 tank topside

 

 

Lighting cable missing

Cable

 

 

3×2.5

 

 

16m

  

 

No.2 tank top side

 

 

 

 

 

Socket cable missing

Cable

 

 

3×4+1×2.5

 

 

15m

 

 

 

 

 

3.5

 

 

 

No.2 tank back side

 

 

 

 

Lighting

cable missing

Cable3×2.516m
   Trip

tank control 1 2

Cable4×1各一根each one16m
   Pill tank

power

Cable3×4+1×2.516m
   Desander

control

Cable4×116m
   Desliter

control

Cable4×116m
 

 

 

 

 

 

 

 

 

3.6

 

 

 

No.1 tank

 

 

 

 1 2 Trip

tank control

Cable

 

4×1

 

20m

   Lighting cable missing

Cable

 

3×2.5

 

14m

   Trip pump power

Cable

 

3×4+1×2.5

 

18m

     
   

 

 

 Pill pump

Cable

 

3×2.5

 

18m

    

 

Trip Tank

Cooling Blower 

 

3×4+1×2.5

 

 

11

     
4engine and air compressor house
4.1 

 

 

 

 

air source house, dryer control panel

 

 

 

 

 

 

missing one breaker

B16-400V-3P/MT 350A 450718 
missing

intermediate relay

voltage24V-DC DYF-11A2  sets
missing securedMax 6.3A 800V 4mm²/600v

 

2
missing

input power cable

3*2.5+1*1.5

 

 

2 pcs(7m for each pcs)
missing

electromagnetic valve

V5221-08 24V DC 4.8W

 
4.2 

 

 

 

 

air source house junction box

 Some cable has been cut off in the junction box, new cable must been equipped for it.  
missing 63A breakerB16-400V-3P1pc
missing 63A breaker 63A 2p1pc
Breaker 25A 2P2
Breaker 25A 3P2
  3*4+1*2.51pc
missing

power input cable

 
  
4.3The

control panel of the

missing

power input cable

3*35+1*2.53pc
missing intermediate relayKT1 DMB51CM 24B006/24V DC 1.5W 

2sets

5Mast
5.1Mast Aviation lights 1PCS
Earching pole missing three pcs 
Lighting

cable demaged

Cable3×410m
6 

 

SCR house

 

6.1Outlet panel of top VFD house  

Alarm

lighting is damaged

 

  One set
6.2 

 VFD outlet panel plug and socket

 

 

missing some plugs 

 

 

Plugs

三相四极60A 3 pcs;

三相四极60A 3pcs

三相四极150A 1 pcs

三相四极100A 1pcs

三相四极200A 2 pcs

三相五极25A 2pcs

 
6                                                              SCR house
6.1Outlet panel of top VFD house   One set
 

 

 

6.2

 

 VFD outlet panel plug and socket

 

 

 

 

 

Plugs

三相四极60A 3 pcs;

三相四极60A 3pcs

三相四极150A 1 pcs

三相四极100A 1pcs

三相四极200A 2 pcs

三相五极25A 2pcs

 
  ,CEB Power indication water off

alarm

  

4×1 4pin

 
  12,CED

Overtemperature alarm

  

3×1 3pin

 
  CEB

flow control

CEB

flow control

 2×1 2pin 
  (DC)

electromagnetic

brake power

  

4×10 60A 4pin

 
  1 2, Weight pump control  

5×1 5pin

 
  Desander control 5×1 5pin 
  Deslite

control cable

 5×1 5pin 
  1 2, Discharge pump

control

  

5×1 5pin

 
  Shear

pump control

 5×1 5pin 
  lighting for

pump area

 3×2.5 3pin 25A 
  lighting

for water tank area

 3×2.5 3pin 25A 
6.3

 

plug and sockets missing for outlet panel of SCR house

lighting

for oil tank area

  

 

 

 

 

 

 

 

the plug and sockets are found, can fabricate

 

 3×2.5 3pin 25A 
1-4

,lighting for solid

  3×2.5 3pin 25A 
lighting for

rig floor

  3×4 3pin 60A 
lighting

for rig house

  3×4 3pin 60A 
lighting for

well site

  3×4 3pin 60A 
1号,2for #1,#2 flood light  3×4 3pin 60A 
power

for camp area

rig floor

  3×50+1×35 300A 4pin 
  3×25+1×16 100A 4pin 

 

logging   3×25+1×16 100A 4pin 
power

for oil tank area

  3×25+1×16 100A 4pin 
power

for BOP

  4×10 60A 4pin 
1 2

power for weight

  3×35+1×25 150A 4pin 
water  3×25+1×16 100A 4pin 
cooling

water area

  3×25+1×16 100A 4pin 
centrifuge power  3×35+1×25 150A 4pin 
1-4 solid control

1-4

  3×35+1×25 150A 4pin 
desander

power

  3×35+1×25 150A 4pin 
  deslite  3×35+1×25 150A 4pin 
  doghouse power   3×25+1×16 100A 4pin 
  tool

house power

   3×25+1×16 100A 4pin 
  water

tank area power

   3×25+1×16 100A 4pin3 pcs
  shear

pump power

   3×35+1×25 150A 4pin2sets
Posted in InventoryList.